Why interlock project costs vary
The visible pavers are only one part of the project. Access, excavation, base work, drainage, cuts, and details shape the real scope.
The work below the surface
Long-term performance starts with excavation, suitable base preparation, compaction, grading, and water management. Two areas with the same visible size can require very different preparation.
Access and existing conditions
Equipment access, demolition, disposal, utilities, elevations, existing walls, and adjoining surfaces can change the time and sequence required.
Materials and detailing
Paver format, colour variation, borders, curves, cuts, steps, edge restraint, and transitions affect both labour and material requirements.
Compare scope, not only totals
A useful comparison looks at what is included, the proposed construction standard, assumptions, exclusions, and written warranty terms.